ID fotografie: 7437858
      |         13 / 14  
      |          Descarcă





MAREA NEAGRA - CONDUCTA DE GAZE NATURALE - TURKSTREAM - GAZPROM - PUTIN-MILLER


AT SEA, UNSPECIFIED - JUNE 23 : (----EDITORIAL USE ONLY – MANDATORY CREDIT - TURKSTREAM PROJECT / HANDOUT" - NO MARKETING NO ADVERTISING CAMPAIGNS - DISTRIBUTED AS A SERVICE TO CLIENTS----) Construction workers work on a pipe inside of a construction vessel at the construction site of TurkStream and Russian company Gazprom gas pipeline’s offshore of Anapa city in the Black Sea on June 23, 2017. Construction is run with the world's largest construction vessel Pioneering Spirit with the length of 382 meters and width of 124 meters. Pioneering Spirit departed from Port of Rotterdam. TurkStream will directly connect the large gas reserves in Russia to the Turkish gas transportation network, creating a reliable source of energy for Turkey and south-east Europe as construction of the project began today. TurkStream Project / Anadolu Agency
Detalii fotografie
Loc:     At Sea
Sursa:   Hepta/Mediafax Foto
Fotograf:   ABACAPRESS/Hepta
Data:   24 Iunie 2017
Dimensiuni:   7360 x 4912 (2.77 MB)
Cuvinte cheie:
ORIZONTAL BRAA20170623_522 GAZE RESURSE CONDUCTA MAREA NEAGRA TURKSTREAM GAZPROM CONSTRUCTIE TRANSPORT GAZE NATURALE ENERGIE MUNCITORI MUNCITOR MUNCA BRAA20170623_524